Integrated Cost and Schedule Risk Analysis

Overview:

This paper by Dr David Hulett, renowned risk subject matter expert and Andrew Avalon of Long International, looks at the advantages of conducting an integrated Cost & Schedule probabilistic analysis instead the standalone analyses that are prevalent on projects considering that cost and schedule are intertwined.

Previous
Previous

Reviewing Resource Leveled Schedules Using P6

Next
Next

How to Perform CPM Calculations