Understanding the Logic Paths in Multi-Calendar P6 Schedules

Overview:

This paper by Thomas M. Boyle and Patrick M. Kelly, which is very good read, was presented at the 2020 AACE Annual Meeting is a deep dive into the Multiple Float Paths calculation in Primavera P6. The authors have also included an appendix of Multiple Float Paths calculation in two example projects.

Previous
Previous

A Better Graphic to Show Schedule Delay

Next
Next

Check for Non-ASAP Constraint Type in Microsoft Project