Assign Actual Dates in Microsoft Project using Task Details Form
Here is a quick tip on my preferred method for assigning actual start & finish dates to tasks in Microsoft Project, i.e. through the Task Details Form
How to Trace Driving Logic in Microsoft Project 2010
Find out how to trace the driving relationship logic between activities in a Microsoft Project schedule just as you would in Primavera P6
Project 2010 Activity Statistics Summary Schedule
Unlike P6, Microsoft Project 2010 does not have inbuilt Number of Activities fields, so this tip shows a workaround.
P6 Activity Statistics Summary Schedule
This quick tip shows how you can set-up a schedule layout in Primavera P6 to display different number of activity statistics for each WBS element and invariably for the whole project.
My Settings #01: P6 Relationships Tab
In all my P6 layouts, I always enable the Details form on the bottom layout and this post is about the Relationships tab of the Details form.