Selecting the Most Appropriate AACE RP 29R Schedule Analysis Methodology
An overview of the pros and cons of the 9 AACE RP 29R schedule analysis methodologies and 11 factors to consider before choosing an appropriate method.
Delay Analysis Methodologies
What are the pros & cons of these 5 delay analysis methods? As-planned Impacted, As-planned v As-built, Time Impact, As-built but for & Window Analysis.
How to Export Microsoft Project Data to Excel for Analysis
If you have ever used Primavera P6, you would be surprised that exporting from Microsoft Project to Excel does not provide you with a ready to use data.