EPC Schedule Levels
Schedule levels refer to the details of activities in an issued schedule and should not be confused with the physical level of a schedule.
My Settings #05: Schedule Roll-up in Microsoft Excel
This post is about an easy and cost effective way to prepare a simple but very effective one-page summary schedule that will always grab a manager's attention as it can fit into a presentation slide.
My Settings #04: Schedule Roll-up in Microsoft Project & P6
This post is about how I set-up my Microsoft Project 2010 and Primavera P6 v16.1 so that my summary schedules present more meaningful information.