P6 Professional Importing and Exporting Guide
The P6 Professional Importing and Exporting Guide from Oracle contains detailed information about P6 import and export formats and the process of importing and exporting data.
Reviewing Resource Leveled Schedules Using P6
In this must read paper, the renowned Ron Winter explains how to effectively review an automatically resource levelled Primavera P6 schedule and issues to watch out for in the review.
Integrated Cost and Schedule Risk Analysis
This paper looks at the advantages of conducting an integrated Cost & Schedule probabilistic analysis instead the standalone analyses.
How to Perform CPM Calculations
This must-read white paper from Mosaic Projects outlines the basic Critical Path Methods (CPM) calculations and standard way of performing these calculations.
GAO Schedule Assessment Guide: Best Practices for Project Schedules
Schedule Assessment Guide features 10 good practices that will help planners and schedulers to build good schedules or verify the integrity and quality of received schedules.
The Journeymap to Project Risk Analysis (free e-Book)
This 19 paged ebook provides context for project risk analysis with some examples of projects with massive cost overruns.
Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)
This is a guide for conducting project cost and schedule performance analysis by any Project Controls professional.
Earned Value Management Implementation Guide (EVMIG)
TenSix Consulting have made available for download, the latest Earned Value Management Implementation Guide (EVMIG) from the the US Department of Defense (DoD).
An Introduction to Earned Value Performance Management
The team at Mosaic Projects have gone to great length in this well illustrated article to break down Earned Value concept.